Manufacturing

The Cybertruck is built at Gigafactory Texas in Austin, Texas, which opened in 2022.

Production Timeline

Date Milestone
Jun 2023 Franz von Holzhausen drives early build to Petersen Museum
Jul 2023 First unit assembled at Gigafactory Texas
Nov 2023 Pilot production begins
Nov 30, 2023 First customer deliveries at delivery event
Jan 2024 Foundation Series deliveries begin
Jun 2024 ~1,300 units/week production rate
Aug 2024 Reservations closed; RWD discontinued
Oct 2024 Foundation Series ends
Apr 2025 “Long Range” (RWD) rebranded at $69,990
Sep 2025 Long Range discontinued
Feb 2026 AWD price cut to $59,990
Apr 2026 New Dual Motor AWD trim launches

Manufacturing Challenges

The Cybertruck’s stainless steel body presents unique manufacturing challenges:

  • Air bending — instead of traditional stamping, panels are formed using air pressure, a slower process
  • Laser cutting — precise but slow compared to stamping dies
  • No paint shop — eliminates one production step but requires extra surface finishing
  • 4680 battery cells — new cell format required new production lines
  • Ultra-Hard ClearShield Glass — custom ceramic glass production

Tesla’s production ramp has been gradual, reaching approximately 1,300 units/week by mid-2024.

Foundation Series

The first 1,750 Cyberbeasts delivered (January–October 2024) were designated “Foundation Series” and carried a ~$20,000 premium over the base $99,990 price, bringing the total to approximately $119,990.

Sources: Tesla.com, Wikipedia, Electrek